Plan4ARI

Integrated architecture for trustworthy industrial autonomy

Develop an Artificial Robotic Intelligence stack that makes industrial robots easier to program, safer to deploy, and more adaptive in dynamic human-robot environments.

Partners

Industrial robotics and applied research, side by side

Funding

Co-funded by MUR through the Italian Fund for Applied Sciences, FISA 2024.

Project at a glance

Industrial autonomy, planned for trust.

Industrial robots remain constrained by specialised programming, long engineering cycles and limited adaptation to changing environments. Plan4ARI integrates natural communication, task planning, sensing, motion planning, real-time control and human-centred evaluation.

Duration
48 months
Area
Advanced Manufacturing
Host Institution
COMAU
Research Organization
CNR
Principal Investigator
Nicola Pedrocchi

From AGI to ARI

Robust, safe and verifiable intelligence, embedded in industrial robot workflows.

Plan4ARI does not claim unrestricted general intelligence. It builds Artificial Robotic Intelligence across four levels:

  1. Programming intelligence
  2. Task intelligence
  3. Motion intelligence
  4. Execution intelligence

Architecture

Two cooperating layers for adaptive robot intelligence.

  • Open IPC cognition, world modelling and planning.
  • Core IPC deterministic execution, safety and real-time control.

Demonstrators

Representative industrial scenarios for adaptive autonomy.

  1. 01

    Warehouse Picking

    Heterogeneous objects, natural-language commands, task allocation and online replanning.

  2. 02

    Remanufacturing

    Disassembly of mechanical components with flexible human intervention and force-sensitive interaction.

  3. 03

    Ship Welding

    Mobile manipulators in large, cluttered ship structures, with nearby operators and runtime safety.

Roadmap

Four phases over 48 months

  1. Months 1-12

    Scientific-plan updates, benchmarking and first mockups.

    MS1 · M12

  2. Months 13-24

    Planning chain, sensing fusion, motion planning and neural-controller prototypes.

    MS2 · M24

  3. Months 25-36

    Integration, online replanning and evaluation campaigns.

    MS3 · M36

  4. Months 37-48

    Integrated demonstrators, exploitation and project closure.

    MS4 · M48

Contact

Interested in collaborating?

Write to the research and industrial leads of Plan4ARI about the project, the demonstrators or possible collaborations.

  • Nicola PedrocchiPrincipal Investigator, CNR-STIIMA
  • Nicola LongoProject manager, COMAU